SUPPLEMENTAL REPORT OF THE 2000 BUDGET ACT 2000-01 FISCAL YEAR

Capital Outlay

Item 6110-301-0001--Department of Education--Capital Outlay

1. California School for the Blind--Health Services Facility. The amount of $1,868,000 is provided for construction of a new 5,449 square foot Health Services facility. The building will be single story, type V construction with stucco and wood exterior walls, and have a covered canopy at the access drive for student drop off. The project includes access road, parking for six cars, and landscaping. The request includes $1,515,000 (CCCI 3909) for construction contracts ($1,359,000 building cost), $76,000 for contingency, and $277,000 for project administration. Construction will begin in December 2000 and be completed by November 2001.

2. California School for the Blind--Young Children's Housing. The amount of $87,000 is provided for preliminary plans ($32,000), and working drawings ($55,000) to remodel 3,750 square feet of the Westridge dorm northwest wing. The remodel includes painting, flooring, window treatment, refinishing doors and frames, lighting, and ADA compliance for two restrooms. The future cost for construction is $341,000 (CCCI 3909), including $268,000 for construction contracts, $19,000 for contingency, and $54,000 for project administration. Preliminary plans will begin in September 2000 and be completed by April 2001. Working drawings will begin by April 2001 and be completed by November 2001.

3. California School for Deaf-Fremont--Pupil Personnel Services. The amount of $257,000 is provided for preliminary plans ($111,000) and working drawings ($146,000) to construct a new 8,762 square foot single-story, wood frame building which matches the architecture of adjacent buildings. The future cost for construction is $2,138,000 (CCCI 3909), including $1,750,000 for construction contracts ($1,689,000 building cost), $88,000 for contingency, $227,000 for project administration, and $73,000 for agency-retained items. Preliminary plans will begin in November 2000 and be completed by May 2001. Working drawings will begin by May 2001 and be completed by October 2001.

4. California School for Deaf-Riverside--Middle School Facilities. The amount of $5,572,000 is provided for construction of a new 21,346 square foot middle school, including new school buildings, a bus loop, drop-off area, and a 40-vehicle parking lot. The request includes $4,752,000 (CCCI 3909) for construction contracts ($4,207,000 building cost), $238,000 for contingency, and $582,000 for project administration. The estimated future cost for the project is $90,000 for equipment. Construction will begin in March 2001 and be completed by April 2002.

Item 6120-301-0001--California State Library--Capital Outlay

1. Sutro Library--Interim Measures. The amount of $203,000 is provided for project administration and construction of various capital improvements including: regrading the building perimeter; reworking the storm drainage system; installing egress lighting and smoke detectors; seismic retrofitting the suspended acoustic ceiling; bracing cabinets, files, and shelving; and replacement of mechanical equipment.

2. Sutro Library--Joint Use Facility Study. The amount of $50,000 is provided for a study of the program requirements to relocate the Sutro Library to a joint use facility at San Francisco State University. The Sutro Library would require 30,000 square feet of space. Total program needs and construction costs for the Sutro share of the joint use facility will be identified.

Items 6440-301-0001 and 6440-301-0574--University of California--Capital Outlay

1. Universitywide: Northern Regional Library Facility, Phase 3. The amount of $810,000 is provided to prepare preliminary plans for a 65,985 asf addition to the existing Northern Regional Library Facility (NRLF). The estimated total project cost is $18,025,000 (CCCI 3909) including future costs of $1,005,000 for working drawings, $15,735,000 for construction, and $475,000 for equipment. The amount for construction includes $14,526,000 for construction contracts, $700,000 for contingency, and $509,000 for project administration. The building construction cost is $14,027,000. Preliminary plans are scheduled to begin in August 2000 and be completed by April 2001.

2. Berkeley Campus: Seismic Safety Corrections, LeConte Hall. The amount of $1,105,000 is provided for preparation of working drawings for seismic corrections to LeConte Hall on the Berkeley campus. The project will provide new interior shear walls and other reinforcements as well as mandatory fire, life-safety, and accessibility improvements. The estimated total project cost is $15,290,000 (CCCI 3909) including future costs of $13,365,000 for construction. The amount for construction includes $11,254,000 for construction contracts, $623,000 for contingency, and $1,488,000 for project administration. Building renovation cost is $10,623,000. Working drawings are scheduled to begin in July 2000 and be completed by July 2001.

3. Berkeley Campus: Seismic Safety Corrections, Archaeology Building. The amount of $2,053,000 is provided for preparation of working drawings ($255,000) and construction ($1,798,000) of seismic corrections to the Archaeology Building on the Berkeley campus. The project will provide better connections between the exterior brick walls and the floor and roof diaphragms, improve shear strength, and brace chimneys, and will provide mandatory accessibility and fire and life safety corrections. The total estimated project cost is $2,265,000 (CCCI 3909). University sources have provided $212,000 for preliminary plans. The amount for construction includes $1,689,000 for construction contracts, $60,000 for contingency, and $49,000 for project administration. Building renovation cost is $1,634,000. Working drawings are scheduled to begin in September 2000 and be completed by February 2001. Construction is scheduled to begin in March 2001 and be completed by June 2002.

4. San Francisco Campus: Parnassus Services Seismic Replacement Building. The amount of $1,889,000 is provided to complete working drawings for a new 45,084 asf research support facility to replace the seismically hazardous MR I and II research support structures on the Parnassus site of the San Francisco campus. The estimated total project cost is $49,517,000 (CCCI 3909), including future State costs of $27,554,000 for construction. University sources have provided $756,000 for preliminary plans and $994,000 for working drawings, and will provide $16,910,000 for construction. The amount for construction includes $41,419,000 for construction contracts, $2,071,000 for contingency, and $974,000 for project administration. Building construction cost is $35,991,000. Working drawings are scheduled to begin in May 2000 and be completed by May 2001. The first phase of construction to clear the site is scheduled to begin in November 2000 and be completed by November 2001.

5. Davis Campus: Chemistry Annex Alterations. The amount of $2,564,000 is provided for construction to alter 6,980 asf in the 55,733 asf Chemistry Annex building on the Davis campus. The project will provide alterations for wet laboratories in 6,838 asf of research and research support space and minor alterations to 142 asf of office type space. The estimated total project cost is $2,802,000 (CCCI 3909). The amount for construction includes $2,322,000 for construction contracts, $111,000 for contingency, and $131,000 for project administration. Building renovation cost is $2,322,000. Construction is scheduled to begin in February 2001 and be completed by February 2002.

6. Davis Campus: Life Sciences Alterations, Phase 1. The amount of $3,788,000 is provided for construction to alter 40,150 asf in Hutchinson Hall and Robbins Hall, both life sciences buildings on the Davis Campus. The project includes alterations to 9,416 asf of class laboratories and 30,734 asf of research and office space. The estimated total project cost is $4,199,000 (CCCI 3909). The amount for construction includes $3,402,000 for construction contracts, $170,000 for contingency, and $216,000 for project administration. Building renovation cost is $3,402,000. Construction is scheduled to begin in October 2000 and be completed by January 2003.

7. Davis Campus: Electrical Improvements, Phase 2B. The amount of $8,995,000 is provided for construction to improve electrical service to the Davis campus. The project will expand capacity to the main substation and remove an obsolete substation; install a new underground duct bank; and upgrade electrical service to the west campus. The estimated total project cost is $9,481,000 (CCCI 3909). The amount for construction includes $7,913,000 for construction contracts, $396,000 for contingency, and $686,000 for project administration. Construction is scheduled to begin in August 2000 and be completed by November 2002.

8. Los Angeles Campus: Dance Building Seismic Renovation. The amount of $700,000 is provided for partial funding for preparation of working drawings for seismic corrections and other essential improvements to the Dance Building on the Los Angeles campus. The estimated total project cost is $20,439,000 (CCCI 3909), including future State costs of $13,906,000 for construction. University sources have provided $715,000 for preliminary plans. University sources will provide $424,000 for working drawings and $4,694,000 for construction. The amount for construction includes $16,915,000 for construction contracts, $1,210,000 for contingency, and $475,000 for project administration. Building renovation cost is $15,085,000. Working drawings are scheduled to begin in August 2000 and be completed by June 2001.

9. Riverside Campus: Humanities-Olmsted Hall Seismic Upgrade and Renovation. The amount of $11,167,000 is provided for construction of seismic corrections and other essential improvements in Humanities-Olmsted Hall on the Riverside campus. The project will provide seismic reinforcement to correct seismic hazards, building system upgrades including electrical and HVAC, program improvements, and required code and accessibility improvements. The estimated total project cost is $12,084,000 (CCCI 3909). The amount for construction includes $9,980,000 for construction contracts, $482,000 for contingency, and $705,000 for project administration. Building renovation cost is $9,768,000. Construction is scheduled to begin in August 2000 and be completed by May 2002.

10. Riverside Campus: Physical Sciences 1. The amount of $1,341,000 is provided for preparation of preliminary plans for a 73,250 asf facility for multi-disciplinary instructional and research laboratories for programs in Chemical Sciences on the Riverside campus. The project will provide 5,011 asf for class laboratories and related support space, 58,403 asf for research laboratories and related support space; and 9,836 asf of office-type space. The estimated total project cost is $49,008,000 (CCCI 3909) including future State funding of $2,002,000 for working drawings and $44,665,000 for construction, and future University funding of $1,000,000 for equipment. The amount for construction includes $40,220,000 for construction contracts, $2,010,000 for contingency, and $2,435,000 for project administration. Building construction cost is $37,689,000. Preliminary plans are scheduled to begin in August 2000 and be completed by March 2001.

11. San Diego Campus: Central Plant Equipment Improvements 3. The amount of $7,079,000 is provided for preparation of working drawings ($462,000) and construction ($6,617,000) to expand the central cooling capacity and central distribution system, and increase emergency power capacity, for the San Diego campus. The project will add a chiller, cooling towers, and associated equipment to support Revelle College; construct a 1,400 ogsf addition to the existing utility plant to house an additional emergency power generator, and replace emergency power cable to the School of Medicine. The estimated total project cost is $7,277,000 (CCCI 3909). The amount for construction includes $6,163,000 for construction contracts, $303,000 for contingency, and $151,000 for project administration. Working drawings are scheduled to begin in July 2000 and be completed by March 2001. Construction is scheduled to begin in April 2001 and be completed by October 2002.

12. San Diego Campus: Engineering Building Unit 3B. The amount of $1,714,000 is provided for preparation of preliminary plans for an 87,000 asf facility to provide computer science and engineering instruction and research space on the San Diego campus. The building will provide 12,000 asf of open class laboratories, 65,000 asf of research laboratories and associated support spaces, and 10,000 asf for the Warren College Provost, academic advising, and other academic support services. The estimated total project cost is $40,113,000 (CCCI 3909), including future costs of $2,095,000 for working drawings, $34,290,000 for construction, and $2,014,000 for equipment. The amount for construction includes $31,821,000 for construction contracts, $1,591,000 for contingency, and $878,000 for project administration. Building construction cost is $31,175,000. Preliminary plans are scheduled to begin in July 2000 and be completed by May 2001.

13. Santa Cruz Campus: Film and Digital Media Renovations. The amount of $461,000 is provided for preparation of preliminary plans ($190,000) and working drawings ($271,000) for the Film and Digital Media Renovations project on the Santa Cruz campus. The project will renovate 10,998 asf of the Communications Building for the Film and Video Department and the Communications and Technology Services unit, improve the HVAC system, and provide mandatory fire safety and accessibility improvements. The estimated total project cost is $4,564,000 (CCI 3909) including future costs of $4,103,000 for construction. The amount for construction includes $3,724,000 for construction contracts, $185,000 for contingency, and $194,000 for project administration. Building renovation cost is $3,724,000. Preliminary plans are scheduled to begin in July 2000 and be completed by March 2001. Working drawings are scheduled to begin in March 2001 and be completed by November 2001.

14. Santa Barbara Campus: Engineering-Science Building. The amount of $29,257,000 is provided for preparation of working drawings ($1,243,000) and for construction ($28,014,000) of a 52,000 asf facility to house a multidisciplinary program, including a shared nanofabrication facility, to support engineering and science instruction and research on the Santa Barbara campus. The project will construct 3,400 asf of classroom space, 5,800 asf of instructional laboratories, 26,570 asf of scholarly activity and research space, and 6,230 asf of office-type space. The estimated total project cost is $35,896,000 (CCCI 3909), including future State costs of $1,385,000 for equipment, matched by $4,028,000 for equipment from University sources. The amount for construction includes $25,321,000 for construction contracts, $1,267,000 for contingency, and $1,426,000 for project administration. Building construction cost is $22,887,000. Working drawings are scheduled to begin in July 2000 and be completed by May 2001. Construction is scheduled to begin in June 2001 and be completed by September 2003.

15. Santa Barbara Campus: Sewer System Renewal. The amount of $4,133,000 is provided for construction to correct deficiencies and renew the sewer system on the Santa Barbara campus. The project will rebuild the main campus pump station, replace effluent lines, and replace critical components for transport and delivery of effluent to the Goleta Sanitary District treatment plant. The estimated total project cost is $4,718,000 (CCCI 3909). The amount for construction includes $3,764,000 for construction contracts, $173,000 for contingency, and $196,000 for project administration. Construction is scheduled to begin in September 2000 and be completed by September 2001.

16. Santa Barbara Campus: Life Sciences Building. The amount of $1,173,000 is provided for the preparation of preliminary plans for a new 47,434 asf multi-disciplinary instruction and research facility to accommodate existing and future enrollment growth in the Biological Sciences. The project will construct 3,283 asf of classroom space, 2,782 asf of class laboratory and support space, 30,166 asf of research and support space, and 11,203 asf of academic and administrative offices and support spaces. The estimated total project cost is $29,442,000 (CCCI 3909), including future State costs of $1,114,000 for working drawings, $25,141,000 for construction, and $1,007,000 for equipment, matched by $1,007,000 for equipment from University sources. The amount for construction includes $22,703,000 for construction contracts, $1,135,000 for contingency, and $1,303,000 for project administration costs. Building construction cost is $20,684,000. Preliminary plans are scheduled to begin in July 2000 and be completed by May 2001.

17. Irvine Campus: Arts Renovation and Seismic Improvements, Phase 2. The amount of $3,406,000 is provided for preparation of working drawings ($171,000) and construction ($3,235,000) of seismic corrections and renovation of space in the Art Studio and the Sculpture Studio on the Irvine campus. The project will also upgrade building systems and provide mandatory life-safety and accessibility improvements in both buildings. The estimated total project cost is $3,792,000 (CCCI 3909), including future costs of $201,000 for equipment. The amount for construction includes $2,914,000 for construction contracts, $145,000 for contingency, and $176,000 for project administration. Building renovation cost is $2,729,000. Working drawings are scheduled to begin in July 2000 and be completed by February 2001. Construction is scheduled to begin in March 2001 and be completed by April 2002.

18. Merced Campus: Site Development and Infrastructure, Step 1. The amount of $10,000,000 is provided for preliminary plans, working drawings and partial construction for site and infrastructure development for the Merced campus. This project, the first of three phases, will provide the design and construction of the initial site grading and drainage, circulation, and utility systems serving the first phase of campus development. The estimated total project cost is $46,000,000 (CCCI 3909), including future construction costs of $36,000,000.

19. Merced Campus: Science and Engineering Building. The amount of $5,100,000 is provided for preliminary plans ($2,500,000 from general obligation bond funds) and working drawings ($2,600,000 from the General Fund) for development of the initial laboratory building of approximately 100,000 asf for programs in natural and physical sciences and engineering on the Merced campus. The estimated total project cost is $72,200,000 (CCCI 3909), including future costs of $55,100,000 for construction and $12,000,000 for equipment.

20. Merced Campus: Library/Information Technology Center. The amount of $3,900,000 is provided for preliminary plans ($1,800,000 from general obligation bond funds) and working drawings ($2,100,000 from the General Fund) for development a facility of approximately 120,000 asf to house information technology resources and services and library services, including computer classrooms, video conferencing facilities, instructional technology support services, and other media services on the Merced campus. The estimated total project cost is $55,100,000 (CCCI 3909), including future costs of $39,200,000 for construction and $12,000,000 for equipment.

Item 6440-302-0574--University of California--Capital Outlay

1. Berkeley Campus: Seismic Replacement Building 1. The amount of $15,723,000 is provided for construction of a 44,000 asf facility to replace seismically hazardous space in Warren Hall tower and in the 2223 Fulton Street building on the Berkeley campus. The project will provide flexible dry laboratory space for instruction and research uses. The estimated total project cost is $17,748,000 (CCCI 3909). The amount for construction includes $14,445,000 for construction contracts, $722,000 for contingency, and $556,000 for project administration. Building construction cost is $12,646,000. Construction is scheduled to begin in November 2000 and be completed by February 2003.

2. Berkeley Campus: Seismic Safety Corrections, FEMA Program, Phase 1. The amount of $12,280,000 is provided for partial funding of construction to improve the seismic resistance of four buildings - Barrows Hall, Hildebrand Hall, Latimer Hall, and Silver Laboratory, totaling approximately 337,000 asf on the Berkeley campus. FEMA funds ($35,365,000) and University funds ($21,632,000) initiated construction; State funds ($12,280,000) and University funds ($9,555,000) will complete construction. The estimated total project cost is $89,243,000 (CCCI 3909). The amount for construction includes $57,132,000 for construction contracts, $3,373,000 for contingency, $15,800,000 for relocation, and $2,527,000 for project administration. Building construction costs total $55,582,000. Construction on the first portion of the project (Barrows Hall and Silver Laboratory) began in May 2000 and is scheduled to be completed by August 2001. The second portion of construction (Hildebrand Hall and Latimer Hall) is scheduled to begin in June 2000 and be completed by December 2001.

3. San Francisco Campus: Electrical Distribution System Improvements, Phase 1. The amount of $5,929,000 is provided for preparation of preliminary plans ($203,000), working drawings ($305,000), and construction ($5,421,000) of an upgrade of the electrical system supporting campus instruction and research programs. The estimated total project costs are $5,929,000 (CCCI 3909). The construction costs include $4,934,000 for construction contracts, $268,000 for contingency, and $219,000 for project administration. Preliminary plans are scheduled to begin in July 2000 and be completed by October 2000. Working drawings are scheduled to begin in October 2000 and be completed by March 2001. Construction is scheduled to begin in March 2001 and be completed by May 2003.

4. Davis Campus: Sciences Laboratory Building. The amount of $4,174,000 is provided for preparation of preliminary plans ($2,087,000) and working drawings ($2,087,000) for a 81,384 asf facility to house class laboratories, supporting academic spaces, and a 500-seat lecture hall on the Davis campus. The project will provide 60,055 asf of class laboratories and associated support space, 7,040 asf of classroom space, and 14,289 of instructional support space. The estimated total project cost is $47,298,000 (CCCI 3909), including future costs of $43,124,000 for construction. The construction costs include $39,519,000 for construction contracts, $1,976,000 for contingency, and $1,629,000 for project administration. Building construction cost is $36,892,000. Preliminary plans are scheduled to begin in July 2000 and be completed by April 2001. Working drawings are scheduled to begin in April 2001 and be completed by March 2002.

5. Davis Campus: Veterinary Medicine Laboratory Facility. The amount of $3,658,000 is provided for partial funding for construction of a new 19,335 asf Veterinary Medicine Laboratory Facility on the Davis campus. The project will provide special-purpose class laboratories and related service facilities to replace existing inadequate facilities on the Davis campus. University funds in the amount of $5,707,000 will complete construction. The estimated total project cost is $10,460,000 (CCCI 3909), including $3,658,000 from State funds and $6,802,000 from University sources. The amount for construction includes $8,643,000 for construction contracts, $432,000 for contingency, and $290,000 for project administration. Building construction cost is $7,063,000. Construction is scheduled to begin in September 2000 and be completed by August 2002.

6. Los Angeles Campus: Health Sciences Seismic Replacement Building 2. The amount of $27,095,000 is provided for construction of the Health Sciences Replacement Building 2 on the Los Angeles campus. The project will construct a new 80,000 asf facility for immunology programs in the second phase of a plan to replace academic space in the seismically hazardous Center for the Health Sciences on the Los Angeles campus. The estimated total project cost is $58,705,000 (CCCI 3909), including $29,725,000 from State funds, of which $27,095,000 are construction costs, and $28,980,000 from University funds, of which $25,948,000 are construction costs. The $53,043,000 for construction includes $48,840,000 for construction contracts, $2,438,000 for contingency, and $1,765,000 for project administration. Building construction cost is $46,750,000. Construction is scheduled to begin in March 2001 and be completed by July 2003.

7. Riverside Campus: Science Laboratories 1. The amount of $16,875,000 is provided for preparation of working drawings ($610,000) and construction ($16,265,000) of a 25,600 asf multi-disciplinary instructional and research laboratory building for chemical and Environmental Sciences programs on the Riverside campus. The project will provide 8,531 asf of class laboratories and related support space, 14,127 asf of research laboratories and related support space, and 2,942 asf of office-type space. The estimated total project cost is $17,975,000 (CCCI 3909) including $16,875,000 from State funds, of which $16,265,000 are construction costs, and $1,100,000 from University funds for preliminary plans ($600,000) and future equipment costs ($500,000). The amount for construction includes $14,440,000 for construction contracts, $722,000 for contingency, and $1,103,000 for project administration. Building construction cost is $13,314,000. Working drawings are scheduled to begin in July 2000 and be completed by February 2001. Construction is scheduled to begin in February 2001 and be completed by April 2003.

8. San Diego Campus: Eleanor Roosevelt College Academic Facilities. The amount of $4,200,000 is provided for preparation of preliminary plans ($189,000), working drawings ($231,000) and construction ($3,780,000) for a 14,330 asf facility for Eleanor Roosevelt College on the San Diego campus. The project will provide 9,895 asf for the College Provost, academic advising, and the College's core instructional program; 2,685 asf for other undergraduate academic programs, and 1,750 asf for open access instructional computing laboratories. The estimated total project cost is $4,371,000 (CCCI 3909), including future State costs of $171,000 for equipment. The amount for construction includes $3,492,000 for construction contracts, $150,000 for contingency, and $138,000 for project administration. Building construction cost is $3,086,000. Preliminary plans are scheduled to begin in July 2000 and be completed by November 2000. Working drawings are scheduled to begin in November 2000 and be completed by March 2001. Construction is scheduled to begin in March 2001 and be completed by September 2002.

9. Santa Cruz Campus: Central Heating Plant Expansion, Phase 2. The amount of $2,879,000 is provided for partial funding for the preparation of preliminary plans ($220,000), working drawings ($93,000), and construction ($2,566,000) to expand the existing central heating system for the Santa Cruz campus. The project will replace two existing boilers with two larger new boilers and associated equipment. Office and shop functions will be relocated to make room for the larger boilers. A new 5,375 asf prefabricated building will be constructed to house the relocated office and shop functions. State funds are matched by University funds for preliminary plans ($61,000), working drawings ($33,000), and construction ($909,000). Estimated total project cost is $3,882,000 (CCCI 3909). The amount for construction includes $3,212,000 for construction contracts, $158,000 for contingency, and $105,000 for project administration. Preliminary plans are scheduled to begin in July 2000 and be completed by November 2000. Working drawings are scheduled to begin in November 2000 and be completed by May 2001. Construction is scheduled to begin in May 2001 and be completed by June 2002.

10. Irvine Campus: Humanities/Fine Arts Facilities. The amount of $10,848,000 is provided to complete construction of a 28,051 asf facility housing instructional space for Dance, Drama and Studio Art on the Irvine campus. The project will correct existing space deficiencies and accommodate projected enrollment growth in the humanities and fine arts on the Irvine campus. The total project cost is $39,467,000 (CCCI 3909), including previous expenditures of $1,423,000 for preliminary plans, $1,374,000 for working drawings, $23,159,000 for construction, and $2,024,000 for equipment, and including future State funding of $639,000 for equipment. Construction costs to complete construction include $9,832,000 for construction contracts, $481,000 for contingency, and $535,000 for project administration. Building construction cost is $7,983,000 to complete work. Construction is scheduled to begin in August 2000 and be completed by September 2002.

11. Irvine Campus: Physical Sciences Research Facility Seismic Improvements. The amount of $426,000 is provided for construction of seismic corrections to the high-bay laboratory wing of the Physical Sciences Research Facility on the Irvine campus. The estimated total project cost is $475,000 (CCCI 3909). The amount for construction includes $367,000 for construction contracts, $17,000 for contingency, and $42,000 for project administration. Building renovation cost is $367,000. Construction is scheduled to begin in July 2000 and be completed by March 2001.

12. Irvine Campus: UCIMC Building 53 Seismic Improvements. The amount of $2,206,000 is provided for the preparation of preliminary plans ($135,000), working drawings ($110,000), and construction ($1,961,000) of seismic corrections to the 30,000 asf Building 53 for the College of Medicine at the UCI Medical Center. The project will upgrade the lateral load-resisting structural system of the building and provide mandatory accessibility upgrades. The total estimated project cost is $2,206,000 (CCCI 3909). The amount for construction includes $1,765,000 for construction contracts, $89,000 for contingency, and $107,000 for project administration. The building renovation cost is $1,765,000. Preliminary plans are scheduled to begin in July 2000 and be completed by February 2001. Working drawings are scheduled to begin in February 2001 and be completed by July 2001. Construction is scheduled to begin in July 2001 and be completed by October 2002.

13. Irvine Campus: Irvine Hall Seismic Improvements. The amount of $995,000 is provided for preparation of preliminary plans ($79,000), working drawings ($56,000), and construction ($860,000) of seismic corrections to the College of Medicine's 39,300 asf Irvine Hall on the Irvine campus. The project will upgrade the lateral load-resisting structural system of the building and provide mandatory accessibility upgrades. The total estimated project cost is $995,000 (CCCI 3909). The costs for construction include $776,000 for construction contracts, $39,000 for contingency, and $45,000 for project administration. The building renovation cost is $776,000. Preliminary plans are scheduled to begin in July 2000 and be completed by February 2001. Working drawings are scheduled to begin in February 2001 and be completed by July 2001. Construction is scheduled to begin in July 2001 and be completed by June 2002.

14. Irvine Campus: Central Plant Chiller Expansion, Step 4. The amount of $3,541,000 is provided for preparation of working drawings ($161,000) and construction ($3,380,000) of a new chiller and cooling tower at the existing Central Plant facility on the Irvine campus. The estimated total project cost is $3,690,000 (CCCI 3909). The amount for construction includes $3,090,000 for construction contracts, $125,000 for contingency, and $165,000 for project administration. Working drawings are scheduled to begin in August 2000 and be completed by November 2000. Construction is scheduled to begin in November 2000 and be completed by September 2001.

15. Agriculture and Natural Resources: Kearney Agricultural Center Greenhouse and Headhouse Facility. The amount of $2,842,000 is provided for the preparation of preliminary plans ($71,000), working drawings ($183,000), and construction ($2,588,000) of 16,600 asf of new greenhouse and headhouse space at the Kearney Agricultural Center in the San Joaquin Valley. The estimated total project cost is $2,842,000 (CCCI 3909). The amount for construction includes $2,405,000 for construction contracts, $102,000 for contingency, and $81,000 for project administration. The building cost is $2,066,000. Preliminary plans are scheduled to begin in July 2000 and be completed by November 2000. Working drawings are scheduled to begin in November 2000 and be completed by March 2001. Construction is scheduled to begin in March 2001 and be completed by May 2002.

Items 6610-301-0001 and 6610-301-0574--California State University--Capital Outlay

1. Chico, Telecommunications Infrastructure. The amount of $13,597,000 is provided for working drawings ($432,000 from general obligation bonds) and construction ($13,165,000 from the General Fund) for telecommunications infrastructure. Total estimated project cost is $13,853,000 (CCCI 3909) including $256,000 for preliminary plans. The amount for construction includes $11,122,000 for construction contracts, $779,000 for contingency, and $1,264,000 for project administration. Working drawings are scheduled to begin July 2000 and be completed by December 2000, and construction is scheduled to begin in March 2001 and will be completed by December 2002.

2. Dominguez Hills, Telecommunications Infrastructure. The amount of $3,760,000 is provided for construction for telecommunications infrastructure. Total estimated project cost is $4,016,000 (CCCI 3909) including $256,000 for working drawings. The amount for construction includes $2,992,000 for construction contracts, $209,000 for contingency, and $559,000 for project administration. Construction is scheduled to begin in November 2000 and will be completed by September 2001.

3. Hayward, Telecommunications Infrastructure. The amount of $1,931,000 is provided for working drawings ($374,000) and construction ($1,557,000) for the first phase of telecommunications infrastructure on campus. Total estimated project cost is $10,697,000 (CCCI 3909) including $226,000 for preliminary plans and future cost of $8,540,000 for construction of the second phase. The amount for construction includes $1,230,000 for construction contracts, $86,000 for contingency, and $241,000 for project administration in phase I. Working drawings are scheduled to begin July 2000 and be completed by May 2001 and construction for phase I is scheduled to begin in December 2000 and will be completed by June 2001.

4. Humboldt, Telecommunications Infrastructure. The amount of $337,000 is provided for working drawings for telecommunications infrastructure. Total estimated project cost is $10,689,000 (CCCI 3909) including $551,000 for preliminary plans and future cost of $9,801,000 for construction. The amount for construction includes $8,239,000 for construction contracts, $577,000 for contingency, and $985,000 for project administration and other costs. Working drawings are scheduled to begin July 2000 and be completed by June 2001.

5. Long Beach, Telecommunications Infrastructure. The amount of $13,546,000 is provided for construction of telecommunications infrastructure. Total estimated project cost is $14,492,000 (CCCI 3909) including $524,000 for preliminary plans and $422,000 for working drawings. The amount for construction includes $11,290,000 for construction contracts, $790,000 for contingency, and $1,466,000 for project administration and other costs. Construction is scheduled to begin in January 2001 and will be completed by June 2003.

6. Los Angeles, Telecommunications Infrastructure. The amount of $7,521,000 is provided for construction of telecommunications infrastructure. Total estimated project cost is $8,031,000 (CCCI 3909) including $160,000 for preliminary plans and $350,000 for working drawings. The amount for construction includes $6,259,000 for construction contracts, $438,000 for contingency, and $824,000 for project administration and other costs. Construction is scheduled to begin in January 2001 and will be completed by January 2002.

7. Maritime Academy, Telecommunications Infrastructure. The amount of $131,000 is provided for working drawings for telecommunications infrastructure. Total estimated project cost is $2,215,000 (CCCI 3909) including future cost of $2,084,000 for construction. The amount for construction includes $1,584,000 for construction contracts, $111,000 for contingency, and $389,000 for project administration. Working drawings are scheduled to begin July 2000 and be completed by May 2001.

8. Northridge, Telecommunications Infrastructure. The amount of $4,658,000 is provided for construction of telecommunications infrastructure. Total estimated project cost is $5,157,000 (CCCI 3909) including $279,000 for preliminary plans and $220,000 for working drawings. The amount for construction includes $3,798,000 for construction contracts, $266,000 for contingency, and $594,000 for project administration and other costs. Construction is scheduled to begin in December 2000 and will be completed by June 2002.

9. Pomona, Telecommunications Infrastructure. The amount of $7,349,000 is provided for construction of telecommunications infrastructure. Total estimated project cost is $7,866,000 (CCCI 3909) including $286,000 for preliminary plans and $231,000 for working drawings. The amount for construction includes $6,113,000 for construction contracts, $428,000 for contingency, and $808,000 for project administration and other costs. Construction is scheduled to begin in October 2000 and will be completed by June 2002.

10. Sacramento, Telecommunications Infrastructure. The amount of $482,000 is provided for working drawings for telecommunications infrastructure. Total estimated project cost is $17,424,000 (CCCI 3909) including $212,000 for preliminary plans and $16,730,000 future cost for construction. The amount for construction includes $14,192,000 for construction contracts, $993,000 for contingency, and $1,545,000 for project administration and other costs. Working drawings are scheduled to begin July 2000 and be completed by June 2001.

11. San Bernardino, Telecommunications Infrastructure. The amount of $4,671,000 is provided for construction of telecommunications infrastructure. Total estimated project cost is $4,949,000 (CCCI 3909) including $278,000 for working drawings. The amount for construction includes $3,816,000 for construction contracts, $267,000 for contingency, and $588,000 for project administration and other costs. Construction is scheduled to begin in December 2000 and will be completed by June 2002.

12. San Luis Obispo, Telecommunications Infrastructure. The amount of $428,000 is provided for working drawings for telecommunications infrastructure. Total estimated project cost is $13,805,000 (CCCI 3909) including $13,377,000 future cost for construction. The amount for construction includes $11,312,000 for construction contracts, (CCCI 3909) $792,000 for contingency, and $1,273,000 for project administration and other costs. Working drawings are scheduled to begin July 2000 and be completed by June 2001.

13. Sonoma, Telecommunications Infrastructure. The amount of $6,105,000 is provided for working drawings ($236,000 from general obligation bonds) and construction ($5,869,000 from the General Fund) for telecommunications infrastructure. The amount for construction includes $4,846,000 for construction contracts, $339,000 for contingency, and $684,000 for project administration and other costs. Working drawings are scheduled to begin July 2000 and be completed by March 2001, and construction is scheduled to begin in June 2001 and will be completed by October 2002.

14. Stanislaus, Telecommunications Infrastructure. The amount of $208,000 is provided for working drawings for telecommunications infrastructure. Total estimated project cost is $5,170,000 (CCCI 3909) including $64,000 for preliminary plans and $4,898,000 future cost for construction. The amount for construction includes $4,011,000 for construction contracts, $281,000 for contingency, and $606,000 for project administration and other costs. Working drawings are scheduled to begin July 2000 and be completed by May 2001.

Item 6610-302-0574--California State University--Capital Outlay

1. Maritime Academy, Engineering Building Renovation and Addition. The amount of $5,849,000 is provided for preliminary plans ($231,000), working drawings ($176,000) and construction ($5,442,000) of a 3,750 asf addition and renovation of 18,013 asf of the Engineering building. The project would add 2,250 asf of classroom space and 1,500 asf of teaching laboratories, and renovate 18,013 asf of teaching laboratories. The amount for construction includes $4,660,000 for construction contracts, $302,000 for contingency and $480,000 for project administration and other costs. Construction is scheduled to begin in November 2001 and will be completed by September 2002.

2. San Marcos, Library Information Center. The amount of $38,710,000 is provided for construction of a 140,000 asf library and information center containing 51,000 asf for bookstacks, 41,000 asf for reader stations, 29,000 asf for technical processing and public services, 15,000 asf for a multimedia center and 4,000 asf for self-instructional computer labs. Total estimated construction cost is $39,192,000 including $482,000 of nonstate funds. Total estimated project cost is $44,597,000 including $1,518,000 of nonstate funds for preliminary plans and working drawings, and a future cost of $3,887,000 for equipment. The amount proposed for construction includes $33,840,000 for construction contract, $1,692,000 for contingency and $3,178,000 for project administration and other costs. Construction is scheduled to start September 2000 and be completed by May 2003.

3. Long Beach, Peterson Hall Addition. The amount of $29,166,000 is provided for construction of a 54,827 asf addition to Peterson Hall containing teaching laboratories and faculty offices. Total estimated project cost is $34,294,000 (CCCI 3909) including preliminary plans ($715,000) and working drawings ($713,000), and a future cost of $3,689,000 of equipment. The amount proposed for construction includes $25,467,000 for construction contracts, $1,273,000 for contingency and $2,426,000 for project administration and other costs. Construction is schedules to start September 2000 and be completed by December 2002.

4. Monterey Bay, Science/Academic Center. The amount of $14,450,000 is provided for construction of a 40,000 asf facility containing teaching laboratories, classrooms and faculty offices. Total estimated project cost (exclusive of preliminary plans and working drawings which were nonstate funded) is $22,119,000 (CCCI 3909) including $5,684,000 of nonstate funds for construction and a future cost of $1,985,000 for equipment. The amount proposed for construction includes $16,638,000 for construction contracts, $832,000 for contingency and $2,664,000 for project administration and other costs. Construction is scheduled to start July 2000 and be completed by September 2003.

5. San Diego, Seismic Upgrade, Imperial Valley Auditorium/Classroom. The amount of $965,000 is provided for working drawings ($29,000) and construction ($936,000) for seismic upgrade of an 11,046 asf auditorium building that includes five classrooms and a computer laboratory. Total estimated project cost is $1,000,000 including preliminary plans ($35,000). The amount proposed for construction includes $774,000 for construction contracts, $54,000 for contingency and $108,000 for project administration and other costs. Working drawings are scheduled to begin July 2000 and be completed by October 2000. Construction is scheduled to begin January 2001 and be completed by August 2001.

Item 6870-301-0574--California Community Colleges--Capital Outlay

1. Antelope Valley Community College District, Antelope Valley College, Technology Building. The amount of $4,796,000 is provided for construction of a 13,948 asf building to house technology programs, including 11,936 asf teaching laboratory, 500 asf lecture, and 1,512 asf offices space. Total estimated project cost is $5,544,000 including preliminary plans ($171,000), working drawings ($184,000), construction ($4,796,000) (CCCI 3909) and equipment ($393,000) (EPI 2502). The amount for construction includes $215,000 for contingency, $289,000 for project administration and $4,292,000 for construction contracts. Estimated building construction cost is $3,483,000. Construction is scheduled to begin in May 2001 and will be completed by May 2002.

2. Barstow Community College District, Barstow College--Library/Learning Resource Center. The amount of $6,638,000 is provided for construction of a 19,976 asf Library/Learning Resource Center, including 11,097 asf library, 1,560 asf office, 7,319 asf AV/TV space. Total estimated project cost is $8,419,000 including preliminary plans ($257,000), working drawings ($254,000), construction ($6,638,000) (CCCI 3909) and equipment ($1,270,000) (EPI 2502). The amount for construction includes $298,000 for contingency, $372,000 for project administration and $5,968,000 for construction contracts. Estimated building construction cost is $4,875,000. Construction phase is scheduled to begin in November 2000 and be completed in January 2002.

3. Butte-Glenn Community College District, Butte College--Allied Health & Public Services. The amount of $16,572,000 is provided for construction of a 45,458 asf multi-story instructional building and a 6,209 asf public safety shop and storage facility and remove 22,008 asf in six unsafe portable buildings. The project includes 28,414 asf laboratory, 6,021 asf office, 2,155 asf library, 87 asf AV/TV, and 14,990 asf other space. Total estimated project cost is $19,334,000 (CCCI 3909) including preliminary plans ($620,000), working drawings ($634,000), construction ($16,572,000) and equipment ($1,508,000). The amount for construction includes $751,000 for contingency, $804,000 for project administration and $15,017,000 for construction contracts. Estimated building construction cost is $12,987,000. Construction phase is scheduled to begin in February 2001 and be completed by June 2002.

4. Cabrillo Community College District, Cabrillo College--Horticulture Facilities Replacement. The amount of $1,644,000 is provided for construction of a 14,060 asf of horticulture facilities. The project includes 392 asf office space and 13,768 asf other demonstration space. Total estimated project cost is $1,885,000 (CCCI 3909) including preliminary plans ($67,000), working drawings ($64,000), construction ($1,644,000) and equipment ($110,000). The amount for construction includes $70,000 for contingency, $165,000 for project administration and $1,409,000 for construction contracts. Estimated building construction cost is $1,024,000. Construction phase is scheduled to begin July 2000 and be completed by July 2001.

5. Cerritos Community College District, Cerritos College--Seismic Retrofit, Administration. The amount of $101,000 is provided for preliminary plans and working drawings at renovate a 32,378 asf administration building. Space to be renovated includes 16,619 asf office space, 10,772 asf health services, 3,316 asf lounge space, and 1,671 asf business services space. Total estimated project cost is $1,218,000 (CCCI 3909) including preliminary plans ($48,000), working drawings ($53,000) and construction ($1,117,000). The amount for construction includes $65,000 for contingency, $130,000 for project administration and $922,000 for construction contracts. Preliminary plans are scheduled to start August 2000 and be completed November 2000. Working drawings are scheduled to start November 2000 and be completed March 2001.

6. Cerritos Community College District, Cerritos College--Seismic Retrofit, Liberal Arts. The amount of $78,000 is provided for preliminary plans and working drawings to renovate a 15,762 asf liberal arts building. Space to be renovated includes 9,207 asf lecture, 3,422 asf of labs, 2,331 asf of offices and 802 asf of other areas. Total estimated project cost is $957,000 (CCCI 3909) including preliminary plans ($38,000), working drawings ($40,000) and construction ($879,000). The amount for construction includes $50,000 for contingency, $119,000 for project administration and $710,000 for construction contracts. Preliminary plans are scheduled to start August 2000 and be completed November 2000. Working drawings are scheduled to start November 2000 and be completed March 2001.

7. Cerritos Community College District, Cerritos College--Seismic Retrofit, Social Sciences. The amount of $177,000 is provided for preliminary plans and working drawings at renovate a 38,905 asf social science building. Space to be renovated includes 20,609 asf lecture, 7,925 asf of labs, 6,972 asf of offices, 2,700 asf AV/TV space, and 699 asf of other areas. Total estimated project cost is $2,188,000 (CCCI 3909) including preliminary plans ($83,000), working drawings ($94,000) and construction ($2,011,000). The amount for construction includes $121,000 for contingency, $170,000 for project administration and $1,720,000 for construction contracts. Preliminary plans are scheduled to start August 2000 and be completed November 2000. Working drawings are scheduled to start November 2000 and be completed March 2001.

8. Coast Community College District, Orange Coast College--Seismic Retrofit Library. The amount of $2,308,000 is provided for construction for the seismic retrofit of the Library building. Total estimated project cost is $2,546,000 including preliminary plans ($93,000), working drawings ($145,000) and construction ($2,308,000) (CCCI 3909). The amount for construction includes $134,000 for contingency, $157,000 for project administration and $2,017,000 for construction contracts. Estimated building cost is $1,656,000. Construction phase is scheduled to begin in April 2001 and will be completed by November 2001.

9. Compton Community College District, Compton College--Seismic Replacement/Expansion Learning Resource Center. The amount of $9,484,000 is provided for construction of a 30,000 asf replacement learning resource center. The project includes 3,000 asf laboratory, 700 asf office, 12,410 asf library, 7,710 asf AVTV, and 6,180 asf other space. Total estimated project cost is $12,177,000 (CCCI 3909) including preliminary plans ($287,000), working drawings ($448,000), construction ($9,484,000) and equipment ($1,958,000). The amount for construction includes $428,000 for contingency, $506,000 for project administration and $8,550,000 for construction contracts. Estimated building construction cost is $7,866,000. Construction phase is scheduled to begin December 2000 and be completed by March 2002.

10. Compton Community College District, Compton College--Child Development Center. The amount of $2,554,000 is provided for construction of a 9,087 asf expansion to an existing on-campus instructional facility for the child development program. The project will add 720 asf laboratory, 261 asf office and 8,106 asf other space including 7,601 asf child development space. Total estimated project cost is $2,975,000 (CCCI 3909) including preliminary plans ($68,000), working drawings ($97,000), construction ($2,554,000) and equipment ($256,000). The amount for construction includes $110,000 for contingency, $248,000 for project administration and $2,196,000 for construction contracts. Estimated building construction cost is $1,845,000. Construction phase is scheduled to begin February 2001 and be completed by October 2002.

11. El Camino Community College District, El Camino College--Science Complex Renovation (Health and Safety). The amount of $1,031,000 is provided for preliminary plans and working drawings at renovate a 48,923 asf science building. Space to be renovated includes 42,792 asf of labs, 5,311 asf of offices and 820 asf of other areas. Total estimated project cost is $14,809,000 (CCCI 3909) including preliminary plans ($483,000), working drawings ($548,000) and construction ($13,778,000). The amount for construction includes $860,000 for contingency, $639,000 for project administration and $12,279,000 for construction contracts. Preliminary plans are scheduled to start September 2000 and be completed November 2000. Working drawings are scheduled to start December 2000 and be completed May 2001.

12. Gavilan Community College District, Gavilan College--Adaptive Physical Education. The amount of $2,551,000 is provided for construction of an 8,473 asf adaptive physical education facility. The project includes 8,473 asf of other demonstration space. Total estimated project cost is $2,858,000 (CCCI 3909) including preliminary plans ($113,000), working drawings ($101,000), construction ($2,551,000) and equipment ($93,000). The amount for construction includes $113,000 for contingency, $210,000 for project administration and $2,228,000 for construction contracts. Estimated building construction cost is $1,663,000. Construction phase is scheduled to begin September 2000 and be completed by November 2001.

13. Grossmont-Cuyamaca Community College District, Cuyamaca College--Remodel Vocational Technology Building N. The amount of $1,040,000 is provided for construction and equipment to renovate 4,861 asf from the Vocational Technical N Building to a High Tech Math Learning Center. The renovation affects 4,411 asf laboratory and 450 asf office space. Total estimated project cost is $1,108,000 (CCCI 3909) including preliminary plans ($29,000), working drawings ($39,000), construction ($818,000) and equipment ($222,000). The amount for construction includes $48,000 for contingency, $80,000 for project administration and $690,000 for construction contracts. Construction phase is scheduled to begin in September 2000 and be completed by March 2001.

14. Grossmont-Cuyamaca Community College District, Grossmont College--Learning Resource Center Addition. The amount of $13,724,000 is provided for construction of a 44,716 asf learning resource center facility. The project includes 1,003 asf office, 32,797 asf library, 10,486 asf AV/TV, and 2,855 asf other space. Total estimated project cost is $15,838,000 (CCCI 3909) including preliminary plans ($507,000), working drawings ($522,000), construction ($13,724,000) and equipment ($1,085,000). The amount for construction includes $618,000 for contingency, $787,000 for project administration and $12,319,000 for construction contracts. Estimated building construction cost is $11,576,000. Construction phase is scheduled to begin January 2001 and be completed by August 2003.

15. Kern Community College District, Cerro Coso College--Library Media Center Addition. The amount of $8,274,000 is provided for the construction of a 27,232 asf learning resource center. The project constructs 831 asf office, 21,060 asf library, 2,800 asf AV/TV, and 2,541 asf other space. Total estimated project cost is $10,929,000 including preliminary plans ($249,000), working drawings ($394,000), construction ($8,274,000) at CCCI 3909 and equipment ($2,012,000) at CCCI 2485. The amount for construction includes $377,000 for contingency, $362,000 for project administration and $7,535,000 for construction contracts. Estimated building construction cost is $6,495,000. Construction phase is scheduled to begin November 2000 and be completed by January 2002.

16. Kern Community College District, Eastern Sierra Center--Off/On Site Development. The amount of $3,548,000 is provided for on and off site development for the center's two sites--Mammoth and Bishop. Off site development includes accessing utilities from the point of connection, and widening of and improvements to the district's side of main and access roads. On-site development includes access and development of utilities including water, irrigation, electricity, gas/propane, communications, sewer, drainage, hardscape, landscape, and other support utilities. Total estimated project cost is $3,877,000 including preliminary plans ($163,000), working drawings ($166,000), and construction ($3,548,000) at CCCI 3909. The amount for construction includes $156,000 for contingency, $272,000 for project administration and $3,120,000 for construction contracts. Construction phase is scheduled to begin November 2000 and be completed by January 2002.

17. Kern Community College District, Eastern Sierra Center--Initial Buildings. The amount of $11,598,000 is provided for construction of the initial facilities at the center's two sites - Mammoth and Bishop. Mammoth's 12,240 asf education facility includes 1,181 asf classroom, 4,134 asf laboratory, 2,118 asf office, 1,660 asf library, 489 asf AV/TV, and 2,658 asf other space. Bishop's 19,591 asf education facility includes 1,914 asf classroom, 6,525 asf laboratory, 3,968 asf office, 2,659 asf library, 800 asf AV/TV, and 3,725 asf other space. Total estimated project cost is $14,786,000 including preliminary plans ($343,000), working drawings ($583,000), construction ($11,598,000) at CCCI 3909, and equipment ($2,262,000) at EI 2485. The amount for construction includes $525,000 for contingency, $577,000 for project administration and $10,496,000 for construction contracts. Estimated building construction cost is $9,823,000. Construction phase is scheduled to begin November 2000 and be completed by January 2002.

18. Lake Tahoe Community College District, Lake Tahoe College--Phase II Facilities South. The amount of $7,620,000 is provided for construction of a 27,407 asf physical education and culinary arts facility. The project includes 1,277 asf laboratory, 1,716 asf office, 18,892 asf physical education, and 3,828 asf other space. Total estimated project cost is $8,843,000 (CCCI 3909) including preliminary plans ($527,000), working drawings ($293,000), construction ($7,620,000) and equipment ($403,000). The amount for construction includes $343,000 for contingency, $409,000 for project administration and $6,868,000 for construction contracts. Estimated building construction cost is $5,713,000. Construction phase is scheduled to begin October 2000 and be completed by November 2001.

19. Long Beach Community College District, Long Beach City College (Pacific Coast Campus)--Child Development Center. The amount of $2,935,000 is provided for construction of a 9,066 asf on-campus instructional facility for the child development program. The project constructs 1,048 asf laboratory, 625 asf office and 7,393 asf other space including 6,341 asf child development space. Total estimated project cost is $3,308,000 (CCCI 3909) including preliminary plans ($102,000), working drawings ($142,000), construction ($2,935,000) and equipment ($129,000). The amount for construction includes $132,000 for contingency, $159,000 for project administration and $2,644,000 for construction contracts. Estimated building construction cost is $2,034,000. Construction phase is scheduled to begin November 2000 and be completed by November 2001.

20. Los Angeles Community College District, East Los Angeles College--Technology Center. The amount of $1,271,000 is provided for preliminary plans and working drawings for a 60,611 asf instructional building to replace temporary buildings, and renovates 17,332 asf of existing space. The project constructs 8,733 asf of lecture space, 44,387 asf of laboratories and 4,777 asf of office space. on-campus instructional facility for the child development program. The renovation activates 12,707 asf of lecture, 1,969 asf of laboratories and 2,656 asf of office space. The project demolishes 60,643 as of existing space including 34,854 asf of lecture space, 5,684 asf of laboratories and 13,124 asf of office space. Total estimated project cost is $17,095,000 (CCCI 3909) including preliminary plans ($640,000), working drawings ($631,000) and construction ($15,824,000). The amount for construction includes $729,000 for contingency, $807,000 for project administration and $14,288,000 for construction contracts. Estimated building construction cost is $11,448,000. Preliminary plans are scheduled to begin September 2000 and be completed by November 2000. Working drawings are scheduled to begin November 2000 and be completed by June 2001.

21. Los Angeles Community College District, Los Angeles Harbor College--Fire Alarm Correction. The amount of $2,800,000 is provided for construction of a campus-wide replacement fire alarm system. Total estimated project cost is $3,137,000 (CCCI 3909) including preliminary plans ($182,000), working drawings ($155,000) and construction ($2,800,000). The amount for construction includes $167,000 for contingency, $165,000 for project administration and $2,468,000 for construction contracts. Construction phase is scheduled to begin June 2001 and be completed by June 2002.

22. Los Angeles Community College District, Los Angeles Pierce College--Remodel for Efficiency. The amount of $3,193,000 is provided for construction to renovate or install the ventilation systems in twelve instructional buildings; 137,180 total asf. Total estimated project cost is $3,519,000 (CCCI 3909) including preliminary plans ($150,000), working drawings ($176,000) and construction ($3,193,000). The amount for construction includes $197,000 for contingency, $175,000 for project administration and $2,821,000 for construction contracts. Construction phase is scheduled to begin August 2000 and be completed by August 2001.

23. Los Angeles Community College District, Los Angeles Southwest College--Seismic Replacement - Student Services. The amount of $6,595,000 is provided for construction of a 20,420 asf student services building. The project constructs 725 asf laboratory, 15,615 asf office, and 4,080 asf other space. Total estimated project cost is $7,600,000 (CCCI 3909) including preliminary plans ($252,000), working drawings ($326,000), construction ($6,595,000) and equipment ($427,000). The amount for construction includes $294,000 for contingency, $438,000 for project administration and $5,863,000 for construction contracts. Building construction cost is estimate to be $4,937,000. Construction phase is scheduled to begin February 2001 and be completed by January 2003.

24. Los Angeles Community College District, Los Angeles Valley College--Ventilation Phase II. The amount of $1,380,000 is provided for construction to renovate the ventilation system in five instructional buildings; 81,464 total asf. Total estimated project cost is $1,522,000 (CCCI 3909) including preliminary plans ($65,000), working drawings ($77,000) and construction ($1,380,000). The amount for construction includes $86,000 for contingency, $71,000 for project administration and $1,223,000 for construction contracts. Construction phase is scheduled to begin October 2000 and be completed by February 2001.

25. Mira Costa Community College District, Mira Costa College--Learning & Information Hub. The amount of $11,128,000 is provided to construct a 34,441 asf building to house the Library and Learning Information Hub, including 15,835 asf Library, 4,059 asf AV/TV, 1,114 asf offices and support, 11,840 asf laboratories, and 1,593 asf other space. Total estimated project cost is $13,548,000 (CCCI 3909) including preliminary plans ($488,000), working drawings ($422,000), construction ($11,128,000) and equipment ($1,510,000). The amount for construction includes $500,000 for contingency, $635,000 for project administration and $9,993,000 for construction contracts. Estimated building construction cost is $8,421,000. Construction phase is scheduled to begin in March 2001 and will be completed by March 2003.

26. Monterey Peninsula Community College District--Peninsula Library and Technology Center. The amount of $15,799,000 is provided to construct a 50,872 asf library and technology facility. The project includes 16,383 asf laboratory, 520 asf office, 24,313 asf library, 8,437 asf AV/TV, and 1,219 asf other space. Total estimated project cost is $20,982,000 (CCCI 3909) including preliminary plans ($763,000), working drawings ($600,000), construction ($15,799,000) and equipment ($3,820,000). The amount for construction includes $711,000 for contingency, $873,000 for project administration, and $14,215,000 for construction contracts. Estimated building construction cost is $12,732,000. Construction phase is scheduled to begin March 2001 and will be completed by September 2003.

27. Peralta Community College District, Laney College--Concrete Deck/Protective Membrane Replacement. The amount of $4,994,000 is provided for construction to replace the campus wide concrete deck membrane. Total estimated project cost is $5,412,000 (CCCI 3909) including preliminary plans ($150,000). Working drawings ($268,000), and construction ($4,994,000). The amount for construction includes $306,000 for contingency, $323,000 for project administration, and $4,365,000 for construction contracts. Estimated building construction cost is $4,365,000. Construction phase is scheduled to begin September 2000 and will be completed by November 2000.

28. Rancho Santiago Community College District, Santa Ana College--Seismic Retrofit, Auto Diesel. The amount of $59,000 is provided for preliminary plans and working drawings to correct seismic deficiencies in the Auto Diesel building. Total estimated project cost is $759,000 (CCCI 3909) including preliminary plans ($26,000), working drawings ($33,000) and construction ($700,000). The amount for construction includes $42,000 for contingency, $60,000 for project administration and $598,000 for construction contracts. Preliminary plans are scheduled to begin August 2000 and be completed by October 2000. Working drawings are scheduled to begin November 2000 and be completed by October 2001.

29. Rancho Santiago Community College District, Santa Ana College--Seismic Retrofit, Library A. The amount of $72,000 is provided for preliminary plans and working drawings to correct seismic deficiencies in the Library A building. Total estimated project cost is $931,000 (CCCI 3909) including preliminary plans ($31,000), working drawings ($41,000) and construction ($859,000). The amount for construction includes $52,000 for contingency, $64,000 for project administration and $743,000 for construction contracts. Preliminary plans are scheduled to begin August 2000 and be completed by October 2000. Working drawings are scheduled to begin November 2000 and be completed by December 2001.

30. Rancho Santiago Community College District, Santa Ana College--Seismic Retrofit, Library B. The amount of $86,000 is provided for preliminary plans and working drawings to correct seismic deficiencies in the Library B building. Total estimated project cost is $1,111,000 (CCCI 3909) including preliminary plans ($37,000), working drawings ($49,000) and construction ($1,025,000). The amount for construction includes $63,000 for contingency, $69,000 for project administration and $893,000 for construction contracts. Preliminary plans are scheduled to begin August 2000 and be completed by October 2000. Working drawings are scheduled to begin November 2000 and be completed by December 2001.

31. Rancho Santiago Community College District, Santa Ana College--Seismic Retrofit, Men's Physical Education. The amount of $53,000 is provided for preliminary plans and working drawings to correct seismic deficiencies in the Men's Physical Education building. Total estimated project cost is $676,000 (CCCI 3909) including preliminary plans ($24,000), working drawings ($29,000) and construction ($623,000). The amount for construction includes $37,000 for contingency, $58,000 for project administration and $528,000 for construction contracts. Preliminary plans are scheduled to begin August 2000 and be completed by October 2000. Working drawings are scheduled to begin November 2000 and be completed by October 2001.

32. Rancho Santiago Community College District, Santa Ana College--Seismic Retrofit, Women's Physical Education. The amount of $50,000 is provided for preliminary plans and working drawings to correct seismic deficiencies in the Women's Physical Education building. Total estimated project cost is $636,000 (CCCI 3909) including preliminary plans ($23,000), working drawings ($27,000) and construction ($586,000). The amount for construction includes $35,000 for contingency, $57,000 for project administration and $494,000 for construction contracts. Preliminary plans are scheduled to begin August 2000 and be completed by October 2000. Working drawings are scheduled to begin November 2000 and be completed by October 2001.

33. San Bernardino Community College District, San Bernardino Valley College--Seismic Replacement, Life Science Building. The amount of $2,858,000 is provided for construction of a 30,453 asf seismic replacement building for the Life Sciences and instructional and support space to be relocated from the existing Administration building. The replacement is a FEMA project and the State cost reflects 25% of State eligible costs. The project includes 12,480 asf lecture, 14,173 asf laboratory, and 3,800 asf office space. Total estimated project cost is $11,811,000 including preliminary plans ($420,000--FEMA funded), working drawings ($420,000--$325,000 FEMA funded and $95,000 state funded) and construction ($10,971,000--$8,113,000 FEMA funded and $2,858,000 state funded) at CCI 3909. The amount for construction includes $495,000 for contingency, $569,000 for project administration and $9,907,000 for construction contracts. Estimated building cost is $9,236,000. Construction phase is scheduled to begin in March 2002 and be completed by June 2003.

34. San Bernardino Community College District, San Bernardino Valley College--Seismic Replacement, Campus Center/Administration. The amount of $3,081,000 is provided for construction of a 51,664 asf seismic replacement building for the Campus Center and Administration buildings into one new instructional facility. The replacement is a FEMA project and the State cost reflects 25% of State eligible costs. The project includes 8,442 asf laboratory, 23,882 asf office, and 19,340 asf other space. Total estimated project cost is $13,475,000 including preliminary plans ($473,000--FEMA funded), working drawings ($480,000--$369,000 FEMA funded and $111,000 state funded) and construction ($12,522,000--$9,441,000FEMA funded and $3,081,000 state funded) at CCI 3909. The amount for construction includes $566,000 for contingency, $634,000 for project administration and $11,322,000 for construction contracts. Estimated building cost is $10,643,000. Construction phase is scheduled to begin in March 2002 and be completed by June 2003.

35. San Bernardino Community College District, San Bernardino Valley College--Seismic Replacement, Learning Resource Center. The amount of $2,242,000 is provided for construction of a 28,026 asf seismic replacement building for the Library/Learning Resource Center building. The replacement is a FEMA project and the State cost reflects 25% of State eligible costs. The project includes 14,310 asf Library, 6,636 asf AV/TV, 700 asf office, and 6,380 asf other space. Total estimated project cost is $9,394,000 including preliminary plans ($344,000--FEMA funded), working drawings ($333,000--$232,000 FEMA funded and $101,000 state funded) and construction ($8,717,000--$6,475,000 FEMA funded and $2,242,000 state funded) at CCI 3909. The amount for construction includes $392,000 for contingency, $475,000 for project administration and $7,850,000 for construction contracts. Estimated building construction cost is $7,231,000. Construction phase is scheduled to begin in March 2002 and be completed by June 2003.

36. San Bernardino Community College District, San Bernardino Valley College--Replace Art Building Seismic/FEMA. The amount of $52,000 is provided for working drawings for a 17,623 asf seismic replacement building for the Art Building and Art Gallery Building. The replacement is a FEMA project and the State cost reflects 25% of State eligible costs. The project includes 13,846 asf of laboratory, 1,521 asf office, and 2,256 asf other space. Total estimated project cost is $5,885,000 including preliminary plans ($209,000--FEMA funded), working drawings ($210,000--$158,000 FEMA funded and $52,000 state funded) at and construction ($5,466,000--$4,099,000 FEMA funded and $1,367,000 state funded) at CCI 3909. The amount for construction includes $244,000 for contingency, $339,000 for project administration and $4,883,000 for construction contracts. Estimated building construction cost is $4,564,000. Preliminary plans are scheduled to begin in September 2000 and be completed by November 2000. Working drawings are scheduled to begin in December 2000 and be completed by June 2001.

37. San Bernardino Community College District, San Bernardino Valley College--Seismic Retrofit Auditorium Building. The amount of $281,000 is provided for preliminary plans and working drawings for seismic strengthening of the Auditorium Building. Total estimated project cost is $3,379,000 (CCCI 3909) including preliminary plans ($137,000), working drawings ($144,000) and construction ($3,098,000) at CCI 3909. The amount for construction includes $189,000 for contingency, $205,000 for project administration and $2,704,000 for construction contracts. Preliminary plans are scheduled to begin in September 2000 and be completed by October 2000. Working drawings are scheduled to begin in November 2000 and be completed by May 2001.

38. San Bernardino Community College District, San Bernardino Valley College--Seismic Retrofit Business Education Building. The amount of $169,000 is provided for preliminary plans and working drawings for seismic strengthening of the Business Education Building. Total estimated project cost is $1,953,000 including preliminary plans ($85,000), working drawings ($84,000) and construction ($1,784,000) at CCI 3909. The amount for construction includes $108,000 for contingency, $133,000 for project administration and $1,543,000 for construction contracts. Preliminary plans are scheduled to begin in September 2000 and be completed by October 2000. Working drawings are scheduled to begin in November 2000 and be completed by May 2001.

39. San Bernardino Community College District, San Bernardino Valley College--Seismic Retrofit Technical Building. The amount of $79,000 is provided for preliminary plans and working drawings for seismic strengthening of the Business Education Building. Total estimated project cost is $827,000 including preliminary plans ($43,000), working drawings ($36,000) and construction ($748,000) at CCI 3909. The amount for construction includes $44,000 for contingency, $74,000 for project administration and $630,000 for construction contracts. Preliminary plans are scheduled to begin in September 2000 and be completed by October 2000. Working drawings are scheduled to begin in November 2000 and be completed by May 2001.

40. San Diego Community College District, Centre City Center--Seismic Retrofit Building 136, Snyder Campus. The amount of $278,000 is provided for preliminary plans and working drawings for seismic strengthening of Building 136. Total estimated project cost is $2,804,000 (CCCI 3909) including preliminary plans ($158,000), working drawings ($120,000) and construction ($2,526,000). The amount for construction includes $155,000 for contingency, $146,000 for project administration and $2,225,000 for construction contracts. Preliminary plans are scheduled to begin in July 2000 and be completed by September 2000. Working drawings are scheduled to begin in September 2000 and be completed by July 2001.

41. San Diego Community College District, San Diego City College--Indoor Gym/Physical education. The amount of $9,912,000 is provided for construction of a 35,198 asf physical education facility. The project includes 759 asf office and 34,439 asf physical education space. Total estimated project cost is $10,864,000 (CCCI 3909) including preliminary plans ($572,000), working drawings ($380,000), and construction ($9,912,000). The amount for construction includes $448,000 for contingency, $519,000 for project administration and $8,945,000 for construction contracts. Estimated building construction cost is $6,958,000. Construction phase is scheduled to begin October 2000 and be completed December 2001.

42. San Joaquin Delta College District, San Joaquin Delta College--Electron Microscopy Technology Center. The amount of $6771,000 is provided for construction of a 12,500 asf building to house the electron microscopy program, including 11,298 asf laboratory, 136 asf office and 1,066 other space. Total estimated state project cost is $7,275,000 including preliminary plans ($196,000), working drawings ($308,000), and construction ($6,771,000) at CCCI 3909. The amount for construction includes $304,000 for contingency, $378,000 for project administration and $6,089,000 for construction contracts. Estimated building construction cost is $5,488,000. Construction is scheduled to begin in October 2000 and will be completed by February 2001. The district is contributing $224,000 in construction and $1,500,000 in equipment costs. Total project cost is $8,999,000.

43. San Jose-Evergreen Community College District, San Jose City College--Library/Learning Resource Center. The amount of $11,606,000 is provided for construction of a 37,357 asf library/learning resource center. The project includes 21,450 asf library, 2,289 asf office, 613 asf laboratory, 615 asf AV/TV space, and 12,390 asf of other space type primarily dedicated to electronic carrel areas. Total estimated project cost is $13,142,000 (CCCI 3909) including preliminary plans ($356,000), working drawings ($546,000), construction ($11,606,000) and equipment ($634,000). The amount for construction includes $523,000 for contingency, $621,000 for project administration and $10,462,000 for construction contracts. Estimated building construction cost is $8,926,000. Construction phase is scheduled to begin June 2001 and be completed December 2002.

44. San Mateo Community College District, College of San Mateo--Seismic Upgrade, Phase I. The amount of $4,166,000 is provided for construction of the seismic upgrade of three buildings totaling 59,035 gsf. They are a technical training building listed in the California Community Colleges Seismic Survey as Building #372-25 (East Wing) and #372-27 (West Wing), and a building listed as #372-18 (North Hall), which are all rated as Risk Level VI structures. The buildings include labs, offices and A/V services. Structural reconstruction requires that all buildings be brought to full ADA and other code compliance. Total estimated project cost is $4,554,000 including preliminary plans ($199,000), working drawings ($189,000) and construction ($4,166,000) (CCCI 3909). The amount for construction includes $255,000 for contingency, $273,000 for project administration and $3,638,000 for construction contracts. Construction phase is scheduled to begin in February 2001 and be completed in June 2002.

45. San Mateo County Community College District, Canada College--Child Development Center. The amount of $2,430,000 is provided for construction of a 7,855 asf child development center, including 600 asf laboratory, 5,385 asf demonstration and service, 570 asf administrative and support, and 1300 asf other space. Total estimated project cost is $2,831,000 including preliminary plans ($121,000), working drawings ($78,000), construction ($2,430,000) (CCCI 3909) and equipment ($202,000)(EPI 2502). The amount for construction includes $107,000 for contingency, $182,000 for project administration and $2,141,000 for construction contracts. Estimated building cost is $1,695,000. Construction phase is scheduled to begin in October 2000 and will be completed in September 2001.

46. Santa Barbara Community College District, Santa Barbara City College--Life Science/Geology Renovation. The amount of $7,314,000 is provided for construction of renovations of an existing life science/geology building. The project renovates 25,583 asf including 5,167 of classroom, 17,746 asf of laboratory, 2,352 asf of office and 318 asf of library space. Total estimated project cost is $7,522,000 (CCCI 3909) including preliminary plans ($85,000), working drawings ($123,000) and construction ($7,314,000). The amount for construction includes $450,000 for contingency, $380,000 for project administration and $6,484,000 for construction contracts. Construction phase is scheduled to begin in November 2000 and will be completed in June 2001.

47. Santa Clarita Community College District, College of the Canyons--Performing Arts Center. The amount of $8,291,000 is provided for construction of a 26,249 asf performing arts center. The project includes 119 asf office space and 25,967 asf of theater arts demonstration space. Total estimated project cost is $12,973,000 including preliminary plans ($261,000 - District/local funded and $221,000 state funded), working drawings ($82,000--- District/local funded and $321,000 state funded), construction ($10,429,000--- $2,138,000 District/local funded and $8,291,000 state funded) at CCCI 3909 and equipment $1,675,000 ($369,000 District/local funded and $1,290,000 state funded) at EPI 2502. The amount for construction includes $471,000 for contingency, $569,000 for project administration and $9,389,000 for construction contracts. Estimated building cost is $8,576,000. Construction phase is scheduled to begin July 2001 and be completed in January 2003.

48. Santa Clarita Community College District, College of the Canyons--Seismic Retrofit, Bonelli Center. The amount of $163,000 is provided for preliminary plans and working drawings for seismic strengthening of a 32,718 asf instructional building. The project renovates 11,780 asf of classroom, 10,388 asf of laboratory, 3,871 asf of offices, and 6,729 asf of other space. Total estimated project cost is $1,802,000 (CCCI 3909) including preliminary plans ($85,000), working drawings ($78,000) and construction ($1,639,000) at CCI 3909. The amount for construction includes $101,000 for contingency, $92,000 for project administration and $1,446,000 for construction contracts. Preliminary plans are scheduled to begin July 2000 and be completed in September 2000. Working drawings are scheduled to begin October 2000 and be completed in July 2001.

49. Sequoias Community College District, College of the Sequoias--Seismic Retrofit, Administration Building. The amount of $1,781,000 is provided for preliminary plans, working drawings and construction for seismic strengthening of the Administration Building. Total estimated project cost is $1,781,000 (CCCI 3909) including preliminary plans ($51,000), working drawings ($79,000) and construction ($1,651,000). The amount for construction includes $102,000 for contingency, $86,000 for project administration and $1,463,000 for construction contracts. Preliminary plans are scheduled to begin August 2000 and be completed in December 2000. Working drawings are scheduled to begin December 2000 and be completed in March 2001. Construction is scheduled to begin May 2001 and be completed in October 2001.

50. Siskiyous Joint Community College District, College of the Siskiyous--Districtwide Distance Learning. The amount of $1,840,000 is provided for construction of a 4,054 asf distance learning facility. The project includes 3,403 asf of AV/TV space, 392 asf of office space, and 259 asf of other space. Total estimated project cost is $2,516,000 including preliminary plans ($82,000), working drawings ($71,000) and construction ($2,087,000---$247,000 District funded and $1,840,000 state funded) at CCCI 3909 and equipment ($276,000) at EI 2502. The amount for construction includes $90,000 for contingency, $193,000 for project administration and $1,804,000 for construction contracts. Estimated building cost is $1,471,000. Construction phase is scheduled to begin January 2001 and be completed by March 2002.

51. South Orange Community College District, Saddleback College--Building "A" Demolition and Replacement. The amount of $ 1,244,000 is provided for the demolition and replacement facility for the district's purchasing, facilities planning and central mailroom. The project constructs 3,546 asf office space. Total estimated project cost is $1,244,000 (CCCI 3909) including preliminary plans ($35,000), working drawings ($46,000) and construction ($1,163,000). The amount for construction includes $50,000 for contingency, $114,000 for project administration and $999,000 for construction contracts. Estimated building construction cost is $878,000. Preliminary plans are scheduled to being September 2000 and be completed by October 2000. Working drawings are scheduled to begin November 2000 and be completed by March 2001. Construction phase is scheduled to begin April 2001 and be completed by April 2002.

52. Southwestern Community College District, Southwestern College--Learning Resource Center. The amount of $19,678,000 is provided for construction of a new 64,730 asf three-story learning resource center. The new building consists of 42,250 asf library, 15,095 asf AV/TV, and 7,385 asf office space. Total estimated project cost is $24,185,000 (CCCI 3909) including preliminary plans ($992,000), working drawings ($751,000), construction ($19,678,000) and equipment ($2,764,000). The amount for construction includes $890,000 for contingency, $983,000 for project administration and $17,805,000 for construction contracts. Estimated building construction cost is $15,088,000. Construction phase is scheduled to begin in August 2000 and be completed by June 2002.

53. Ventura County Community College District, Moorpark College--Learning Resources and Telecommunications Center. The amount of $10,793,000 is provided for construction of a 40,039 asf learning resource and telecommunication center. The project includes 7,344 asf laboratory, 1,364 asf office, 26,835 asf library and 4,496 asf AV/TV space. Total estimated project cost is $14,307,000 (CCCI 3909) including preliminary plans ($365,000), working drawings ($506,000), construction ($10,793,000) and equipment ($2,643,000). The amount for construction includes $484,000 for contingency, $621,000 for project administration and $9,688,000 for construction contracts. Estimated building construction cost is $9,210,000. Construction phase is scheduled to begin June 2001 and be completed by July 2003.

54. Ventura County Community College District, Ventura College--Learning Resource Center. The amount of $20,252,000 is provided for construction of a 61,394 asf learning resource center. The project includes 21,265 asf laboratory, 8,531 asf office, 24,969 asf library, 5,604 asf AV/TV, and 1,025 asf other space. The project also renovates 17,080 asf in one building and demolishes 4,154 asf in two older buildings. Total estimated project cost is $24,671,000 (CCCI 3909) including preliminary plans ($668,000), working drawings ($972,000), construction ($20,252,000) and equipment ($2,779,000). The amount for construction includes $955,000 for contingency, $899,000 for project administration and $18,398,000 for construction contracts. Estimated building construction cost is $15,353,000. Construction phase is scheduled to begin May 2001 and be completed by February 2003.

55. West Hills Community College District, Kings County Center--Off/On Site Development. The amount of $3,699,000 is provided for construction of on and off site improvements for the center. The site improvements will support the center's 38,068 asf education facility. Off site development includes roadway improvements and an EIR demanded signal light. On-site development includes access and development of utilities including water, irrigation, electricity, communications, sewer, drainage, hardscape, landscape, and other support utilities. Total estimated project cost is $4,697,000 (CCCI 3909) including preliminary plans ($147,000--$22,000 nonstate funds, $125,000 state funds), working drawings ($192,000--$16,000 nonstate funds, $176,000 state funds) and construction ($4,358,000--$659,000 nonstate funds, $3,699,000 state funds). The amount of state funds for construction includes $167,000 for contingency, $201,000 for project administration and $3,331,000 for construction contracts. Estimated building construction cost is $3,990,000, including both state and nonstate funds. Construction phase is scheduled to begin January 2001 and be completed by May 2001.

56. West Hills Community College District, Kings County Center--Initial Buildings. The amount of $14,393,000 is provided for construction and equipment of the center's initial facilities. Project constructs 5,039 asf classroom, 8,660 asf laboratory, 5,887 asf office, 9,151 asf library, 3,980 asf AV/TV, and 5,351 asf other space. Total estimated project cost is $17,427,000 (CCCI 3909) including preliminary plans ($430,000--$85,000 nonstate funds, $345,000 state funds), working drawings ($634,000--$66,000 nonstate funds, $568,000 state funds), construction ($14,513,000--$1,970,000 nonstate funds, $12,543,000 state funds) and equipment ($1,850,000 state funds). The amount of state funds for construction includes $535,000 for contingency, $615,000 for project administration and $11,393,000 for construction contracts. Estimated building construction cost is $12,386,000, including both state and nonstate funds. Construction phase is scheduled to begin November 2000 and be completed by January 2002.

57. West Valley-Mission Community College District, Mission College--Science and Technology Complex. The amount of $8,929,000 is provided for construction of a 21,070 asf science complex. The project includes 1,500 asf lecture, 17,600 asf laboratory, 990 asf office, and 980 asf other space. Total estimated project cost is $10,445,000 (CCCI 3909) including preliminary plans ($305,000), working drawings ($450,000), construction ($9,000,000) and equipment ($690,000). The amount for construction includes $396,000 for contingency, $466,000 for project administration and $8,138,000 for construction contracts. Estimated building construction cost is $7,625,000. Construction phase is scheduled to begin June 2001 and be completed by July 2002.

58. Yosemite Community College District, Columbia College--Learning Resources/Media Technology Center. The amount of $4,950,000 is provided for construction of a 15,530 asf library/learning resource/media technology facility. The project includes 2,374 asf office,10,222 asf library, 2,472 asf AV/TV, and 462 asf of other space. Total estimated project cost is $5,896,000 including preliminary plans ($156,000), working drawings ($233,000) at CCCI 3847, construction ($4,950,000) at CCCI 3909 and equipment ($557,000) at EPI 2485. The amount for construction includes $220,000 for contingency, $328,000 for project administration and $4,402,000 for construction contracts. Estimated building construction cost is $3,456,000. Construction phase is anticipated to begin March 2001 and be completed by September 2002.

Item 8570-301-0001--Food and Agriculture--Capital Outlay

1. Relocation: Yermo Agriculture Inspection Station. The amount of $780,000 is provided for working drawings for an agricultural inspection station consisting of a 5,700 sf inspection structure, 2,500 sf office building, 900 sf containment building and associated site development and paving. Estimated total project cost is $9,867,000 including a study ($108,000), preliminary plans ($414,000) and future cost of $8,565,000 for construction. Working drawings are scheduled to begin in April 2001 and be completed in July 2002.

2. Relocation: Truckee Agricultural Inspection Station. The amount of $380,000 is provided for working drawings for an agricultural inspection station consisting of an 8,375 gsf inspection structure, 6,840 gsf truck inspection and detention building and associated site development and paving. An additional $153,000 for working drawings is provided by Item 8570-301-0042. Estimated total project cost is $12,189,000 including a study ($100,000), acquisition ($439,000), preliminary plans ($237,000), and future cost of $10,880,000 for construction ($7,460,000 from the General Fund and $3,420,000 from the State Highway Account). Working drawings are scheduled to begin in July 2000 and be completed in August 2001.

Item 8570-301-0042--Food and Agriculture--Capital Outlay

1. Relocation: Dorris Agricultural Inspection Station. The amount of $425,000 is provided for acquisition for relocation of the Dorris Agricultural Inspection Station. Acquisition is scheduled to begin in July 2000 and be completed by September 2001.

2. Relocation: Truckee Agricultural Inspection Station. The amount of $153,000 is provided for working drawings for an agricultural inspection station consisting of an 8,375 gsf inspection structure, 6,840 gsf truck inspection and detention building and associated site development and paving. An additional $380,000 for working drawings is provided by Item 8570-301-0001. Estimated total project cost is $12,189,000 including a study ($100,000), acquisition ($439,000), preliminary plans ($237,000), and future cost of $10,880,000 for construction ($7,460,000 from the General Fund and $3,420,000 from the State Highway Account). Working drawings are scheduled to begin in July 2000 and be completed in August 2001.

Item 8940-301-0001--Military Department--Capital Outlay

1. Camp San Luis Obispo--Modified Record Fire Range. The amount of $134,000 is provided for the state's share of the preliminary plan cost to construct a new automated 16-lane Modified Record Fire Range, an enclosed control tower, restrooms, covered dining area, storage/operations building, ammunition issue building, and a bleacher enclosure. The state's share of the estimated future cost for the project is $251,000, including $125,000 for working drawings and $126,000 for construction supervision. The federal government's share of the future cost is $3,072,000, including $38,000 for working drawings, $2,118,000 (CCCI 3909) for construction contracts, $148,000 for contingency, $68,000 for project administration, and $700,000 for agency-retained items. Preliminary plans will begin in December 2000 and be completed by October 2001.

2. Camp San Luis Obispo--Combat Pistol Qualification Course. The amount of $117,000 is provided for the state's share of the preliminary plan cost to construct a new automated 15-lane Combat Pistol Qualification Course, an enclosed control tower, restrooms, covered dining area, storage/operations building, ammunition issue building, and a bleacher enclosure. The state's share of the estimated future cost for the project is $227,000, including $103,000 for working drawings and $124,000 for construction supervision. The federal government's share of the future cost is $2,272,000, including $28,000 for working drawings, $1,537,000 (CCCI 3909) for construction contracts, $108,000 for contingency, $49,000 for project administration, and $550,000 for agency-retained items. Preliminary plans will begin in December 2000 and be completed by October 2001.

Item 8960-301-0001--Veterans' Home of California, Yountville--Capital Outlay

1. Correct Code Deficiencies in Section L. The amount of $2,994,000 is provided for construction to renovate Jefferson Hall to comply with fire, life safety, and handicap access codes. Improvements include a new fire monitoring and suppression system, HVAC systems, and elevator installation. The amount for construction includes $2,523,000 (CCCI 3909) for construction contracts, $177,000 for contingency, and $294,000 for project administration. Construction will begin in November 2000 and be completed by November 2001.

2. Veterans' Home Cemetery Renovation. The amount of $62,000 is provided for preliminary plans to provide a comprehensive renovation to the existing cemetery. Improvements will include construction of a visitor's kiosk and restrooms, straightening of headstones, installation of an irrigation system, and road repairs. The Department shall report to the Legislature at the time additional project funding is requested with a comprehensive cemetery renovation plan. The scope shall include the work identified above, as well as all other improvements needed to provide a first class memorial cemetery for veterans. The estimated future cost for the project is $1,335,000 for working drawings ($107,000) and construction ($1,228,000). The amount for construction includes $1,008,000 (CCCI 3909) for construction contracts, $71,000 for contingency, and $149,000 for project administration. Preliminary plans will begin in July 2000 and be completed by December 2000.

3. Hospital Emergency Notification System. The amount of $764,000 is provided for preliminary plans ($41,000), working drawings ($75,000), and construction ($648,000) to install an emergency notification system in Holderman Hospital, Acute Care Facility, Eisenhower Building (Annex II), McKinley Hall (Section B), and Madison Hall (Section G). All buildings will be networked through an underground cable system and connected to a central station which will be located in Holderman Hospital. The amount for construction includes $537,000 (CCCI 3909) for construction contracts, $38,000 for contingency, and $73,000 for project administration. Preliminary plans will begin in July 2000 and be completed by March 2001. Working drawings will begin by July 2001 and be completed by December 2001. Construction will begin by May 2002 and will be completed by May 2003.

Item 8965-301-0001--Veterans' Home of California, Barstow--Capital Outlay


1. Assisted Daily Living Space. The amount of $381,000 is provided for preliminary plans, working drawings, and construction to modify existing domiciliary space to an assisted daily living level of care. Improvements will include construction of a nursing station, a nurse call system, client monitoring system, enclosed outdoor patio, room dividers, and modifications to showers, the fire alarm system, and the sprinkler system. The amount for construction includes funding for construction contracts, contingency, project administration, and all new equipment for the project. Preliminary plans will begin in July 2000 and be completed by December 2000. Working drawings will begin by December 2000 and be completed by May 2001. Construction will begin by August 2001 and be completed by October 2002.